弗拉芒维尔 EPR
弗拉芒维尔是继中国设计的100%之后,第一座采用新一代EPR设计(欧洲加压反应堆)建造的反应堆。 2019年投入使用时容量将为1.3GWe。
自 2008 年施工开始直至 2015 年,Dextra 一直在现场。
For this challenging project, Dextra has been supplying its Griptec rebar splicing solution through its local fabricator partners. The rebar preparation was supported by an additional machine placed on site.
Griptec 因其独特的性能水平和自动测试流程而成为核工业的首选钢筋拼接解决方案,该流程可系统地测试作为其标准周期一部分生产的所有连接:保证 100% 的连接性能高于项目要求。
More than 800,000 Griptec connections have been used on the project, including 400,000 position assemblies, allowing the connection of large diameter rebar without rotating them. The Griptec connections have been installed on the reactor building and APC shell, as well as auxiliary buildings.
In particular, Griptec has been used for the connections of large prefabricated panels.
Four-sided panels with Griptec female sleeves and bridging studs
Thanks to its Bridging Assemblies, square panels could be reconnected on four-sided panels while coping for possible misalignment that occurs when lifting the cage.