德克斯达集团|可靠的连接

DEXTRA
搜索
关闭此搜索框。
我的右旋糖酐
搜索
关闭此搜索框。

Pre-grouted anchors for faster excavatations

Excavation anchor supplier in Saudi Arabia

Duba ISCC Green Power Plant 1 is a large power infrastructure project taking place in the North West of Saudi Arabia, on the Red Sea. The project, based on the ISCC technology (Integretad Solar Combined Cycle) is a combined Gas (500 MW) and Solar (additional 50MW) power generation plant.

For Duba Green Power Plant, Dextra supplied its Geotec Double Corrosion Protection (DCP) Permanent Steel ground anchors to prevent soil movement in the perimeter of the excavation.

For this project, Dextra provided a “factory grouting” service, meaning that the anchors arrived at the site as pre-grouted 12-meters segments, ready to re-connect via couplers and to install.

Learn more about that project

请输入您的信息

联系我们

   与我们分享您的信息,我们会尽快回复您。