Dextra Group | Reliable Connections

DEXTRA
Search
Close this search box.
My Dextra
Search
Close this search box.

Cape Town Stadium

Cape Town Stadium

The Cape Town Stadium, also known as the new Green Point Stadium, is a football and multipurpose sport venue located in Cape Town, South Africa. The stadium was built to replace the older Green Point Stadium, which had a capacity of 18,000 seats, and offer a larger arena with a capacity of 55,000 seats in preparation for the 2010 FIFA World Cup hosted by South Africa. The older arena was demolished in 2007, followed by the construction of the new venue which was completed in time in December 2009, a few months before the first world cup match.

For this large stadium project, Dextra supplied its Bartec rebar coupler solution, which is the main rebar coupler solution offered by Dextra in South Africa. Dextra’s offer included 70,000 high-performance rebar couplers, highly productive rebar preparation equipment, as well as a training/aftersales service during all the construction phase in order to guarantee production levels and schedule.

Bartec couplers were used to splice bars in the foundations and columns of the stadium, as vertical connectors.

For more information about rebar coupler availability in South Africa, please consult our Paris office

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.