Dextra Group | Reliable Connections

Battersea Power Station Development, UK

Battersea Power Station Development, UK

The Revitalization of a London Landmark

Battersea Power Station was a decommissioned coal-fired power station located on the south bank of the River Thames in Nine Elms, Battersea, within the London Borough of Wandsworth. It was one of the world’s largest brick buildings and a lasting symbol of London’s industrial past.

After remaining empty for nearly 40 years, a redevelopment plan was launched with the mission of creating a new iconic London landmark.

The third phase of the redevelopment consists of the development of the so-called Electric Boulevard, which will include a connection to the Northern Line Extension station, more than 1,300 residential units, a 160-room hotel, retail spaces, restaurants, and leisure facilities.

Dextra has supplied several rebar coupler solutions to the site. More than 100,000 Griptec and Rolltec cast-in-situ couplers were installed in masonry cells to alleviate rebar congestion caused by long lap lengths.

Additionally, precast concrete panels reinforced with rebars were used in the building, incorporating 30,000 Groutec couplers for onsite connection of continuation bars. The panels were easily lifted into place at the construction site, where the coupler cavities were then filled with non-shrink grouting mortar through the injection holes.

Finally, 3,000 Unitec bolted couplers were installed on rebars for repair work. These couplers were used to replace damaged reinforcements with new ones and to connect them to the finished structure.

The mixed-use community was expected to be completed in 2020, becoming a new landmark for locals, tourists, and residents alike.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.