Dextra Group | Reliable Connections

DEXTRA
Search
Close this search box.
My Dextra
Search
Close this search box.

Forest City Johor 森林城市

Forest City Johor 森林城市

Forest City is a massive mixed-use urban development taking place in the Southern tip of Malaysia, in the Iskandar region, Johor. The development is taking place on reclaimed land just across the Johor Straight, in sight of Singapore.

The project, which will continue over the next decade, aims ultimately to create 300,000 residential units, hosting as many as 700,000 people, as well as numerous commercial buildings.

The Forest City project is expected to fuel the region economy, as well as Singapore, as light rail and road links will ultimately make the connection across the strait with the island state.

Dextra has been involved since the early phases of the project for the supply of its Groutec S precast solution. Groutec allow the swift connection of precast columns and panels, without the need of in situ joints, speeding up the construction project. For the Forest City Project, Groutec S couplers (compact models) were used to connect the panels making the residential towers shear walls.

The Forest City project is supported by the installation at site of several sets of Bartec threading equipment, which prepare the bars with threads in order to perform the connection with the top part of the Groutec sleeve. Dextra aftersales team also provided training and support in order to guarantee high production levels during all the project duration.

For more information about the availability of precast solutions in Asia, please contact our Bangkok office

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.