Dextra Group | Reliable Connections

DEXTRA
Search
Close this search box.
My Dextra
Search
Close this search box.

La Hague nuclear waste reprocessing plant – the interim storage

La Hague site is a nuclear fuel reprocessing facilities located in La Hague, northern France. The plant has been treating spent nuclear waste from several countries since 1960s. Nowadays, Being operated by AREVA NC, it now operates nearly half of the world’s spent nuclear fuel recycling and reprocessing capacity, including waste from France itself, as well as from Japan, Germany, Belgium, Switzerland, Italy, Australia, Spain and the Netherlands.
The reprocessing plant also separates waste of different radioactive activity and life span, and applies specific storage solutions to each type of waste. Therefore, in order to reassure the reinforcement of the plant’s two recent nuclear waste storage, the main contractor VINCI – Travaux Public Cherbourg opted for Dextra’s 100%-proofed splicing system Griptec, delivered through its local fabricators in France.

Griptec, full performance rebar couplers for nuclear projects worldwide

For the construction of nuclear projects, full-performance reinforcement solutions are required. This is the reason why Dextra Griptec was preferred for this project, as it is also certified AFCEN, the international standard for nuclear plants. More than 5,000 tons of Dextra products were delivered on-site for the construction of two storage buildings, both intended to store Uranium and Plutonium.
Griptec couplers are used to reinforce the storages’ walls, as it is a full-performance (tension, compression, cyclic and fatigue) rebar splicing system. The solution provides no place for error, as each and every connection is systematically proof-tested by pull test during extrusion cycle as part of its standard cycle, and can perform above the project requirement. Moreover, for our customers in nuclear industry, Dextra provides more than only reinforcement solutions: we also accompany designers, consultants and contractors through each step of their construction project.

 

For more information about our solutions available in France and Europe, please contact our Paris office.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.