Dextra Group | Reliable Connections

DEXTRA
Search
Close this search box.
My Dextra
Search
Close this search box.

Mega Home Chiang Mai

Mega Home Chiang Mai

Mega Home is a prominent operator of home and construction materials chains in Thailand with more than ten branches across the country. In recent years, Mega Home has been investing in its mega expansion projects, including the construction of its flagship store in Chiang Mai.

Mega Home turned to Groutec couplers. Groutec couplers are a proven solution for connecting precast columns to foundations. They are designed to provide a reliable and durable connection that can withstand the rigors of construction.

Groutec couplers are designed to be easy to install, which made the construction process smoother and faster. The couplers work by connecting the steel reinforcement bars in the precast columns to the reinforcement bars in the foundation. This creates a strong and stable connection that ensures the structural integrity of the building.

The use of Groutec couplers also provided several other benefits to the Mega Home Chiang Mai construction project. For example, the couplers allowed for the use of smaller diameter reinforcement bars, which reduced the overall weight of the precast columns. This, in turn, reduced the size and weight of the cranes required for installation, making the construction process more efficient.

Groutec couplers also provided a cost-effective solution for the project. They eliminated the need for welding or other costly connection methods, which helped to keep the overall cost of the project within budget.

The successful completion of the Mega Home Chiang Mai project was a testament to the technical expertise and experience of the construction team. By using innovative and proven solutions like Groutec couplers, the team was able to overcome the challenges of the project and deliver a high-quality building that will serve Mega Home customers for many years to come.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.