Dextra Group | Reliable Connections

DEXTRA
Search
Close this search box.
My Dextra
Search
Close this search box.

Tanger Med 2 Port

Tanger Med 2 Port

Tanger Med 2 is the expansion of Tanger Med, a multipurpose deep-water sea port located in a few kilometers East from Tangier, in Morocco, facing Gibraltar.

The port expansion aims to increase yearly capacity of the port, the largest in Africa, by 5.2 million containers.

For this large infrastructure project, Dextra supporter contractor Bouygues with a rebar splicing solution for the reinforcement of the caissons.

Dextra supplied its Rolltec solution, which is AFCAB-cerfified, a requirement on this project. Two Rolltec machines were installed to support the threading activities: 360,000 threads in total (180,000 Rolltec couplers).

Couplers were use in the reinforcement of the caisson, which were as tall as 20 to 24 meters. Couplers provided:

 

  • Temporary openings to solve congestion issues in the reinforcement within the caisson. Rebar couplers allow to create a safe passage for men and equipment during installation phase.
  • Horizontal wall-to-slab connections (from the inside of the caisson perimeter to slab). For this application, couplers were left pending, allowing the slip form to go up.

MA Tanger Med 2 Case Study Rolltec MA Tanger Med 2 Case Study Rolltec1

 

For more information and additional applications examples on this project, please refer to our dedicated Case Study.

image03

Download case study

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.