The Plum Central station is a 38-floors condominium project, made of 2 towers and located near Bang Yai elevated metro station, in the North West of Bangkok. The residential building will host 1,013 appartments.

The Phase 1 of the project (first tower) started in September 2015 and will be completed aroundMarch 2018. The fast pace construction is madepossible by the use of “fully precast” concrete techniques.

The owner of the project Pruksa is operating its own precast plant for this project.

For this project, the objective of Pruksa was to be able to quickly erect precast panels (acting as shear walls) for all levels above ground. Dextra suggested for that purpose the use of Groutec couplers.

Groutec couplers, mounted on rebar Ø25mm previously prepared with Bartec thread. The couplers, installed at the bottom of each precast element, are then cast as part of the precast wall panel element.

After lifting the element to the upper floor at site, reconnection to protruding reinforcement is achieve by injecting non-shrink mortar. It is to be noted that Dextra does not provide the mortar, which instead can be sourced locally, generating significant savings. After injecting grout, bracing around each panel can be removed after 3 days.

For more information about The Plum Central Station and Groutec application, please refer to our case study.

 

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.